The specifications stand out.
It’s the little details that create a large living experience. The Skylake is a green development. Its sustainability aspects offer benefits to everyday life.
FOUNDATION & SUPER STRUCTURE
RCC Foundation resting on cast-in-situ reinforced concrete bored piles conforming to IS codes.
EXTERNAL & INTERNAL WALLS
Flyash bricks/A-Grade Red Bricks/AAC blocks or Reinforced concrete wall
EXTERNAL WALLS
Cement & sand plaster with cement paint smooth and/or texture finish at places, as per architectural drawings.
Corridors, staircases, landing & other areas - Cement & sand plaster with neat POP punning, landing finished with two coats of acrylic/enamel paint.
Car park areas - cement & sand plaster finished with cement paint.
Ground Floor Entrance Lobby - Cement & sand plaster finished in POP punning duly painted / marble / granite cladding at designated areas as per interior drawing.
CEILING
Living, Dining, Bedroom, Study, Servant Quarter & Other areas - Cement & sand plaster with neat POP punning.
Kitchen, Bathroom, WC - Cement & sand plaster with neat POP punning, and gypsum ceiling in places to cover traps and pipes.
Typical Lift Lobby - Standard POP / gypsum board with or without drops, and finished in acrylic paint.
Ground Floor Entrance Lobby - Gypsum False ceiling.
Car Park Areas - Cement & sand plaster with neat POP punning. Staircase will be finished with two coats of acrylic paint.
Staircases, M&E Services Room/Shaft & Utility - Cement & sand plaster with neat POP punning. Staircase will be finished with two coats of acrylic paint.
WALLS - APARTMENT UNITS
Living, Dining, Bedroom Study & Other areas - Cement & sand plaster with POP punning.
Kitchen, Bathroom, WC
Kitchen: Ceramic tiles up to height of 2 feet above
Kitchen counter only
Bathroom: Ceramic tiles / designer tiles on the walls up to full height.
Servant Quarters / Stores - Cement & sand plaster with POP punning
FLOORS - APARTMENT UNITS
Living, Dining, Bedroom - High Quality Vitrified Tiles.
Bathroom, WC - Anti-Skid Ceramic Tiles / Vitrified Tiles.
Kitchen - Quality Vitrified Tiles with matching skirting.
Servant Quarter - Ceramic / Vitrified Tiles.
WINDOWS
Standard section of UPVC Sliding Windows with clear glass inserts, matching fittings.
FITTED DOORS
Main Door: Wooden decorative doors with Godrej Tribolt lock & night latch.
Internal door: Solid core flush door with high polish & mortise lock.
Bedroom and kitchen doors shall have a mortise lock and door stopper, and the toilet doors will have a bathroom latch.
BATHROOM - SANITARYWARE
White porcelain sanitary wares of Jaquar or equivalent brand.
Water closets - concealed cistern or flush valve
BATHROOM - CP FITTINGS
Concealed piping system for hot & cold water lines.
Shower cubicle in master toilet only.
Sleek CP fittings of Jaquar or equivalent make.
Matching glass mirror, shelf, soap trayand towel rail.
Cubical Bath in Master Bedroom counter / table top basin.
PIPING SYSTEM
Dual (Hot & Cold) piping system.
KITCHEN
Black or white granite top cooking platform with one SS sink and drain board.
CP Fittings: Sleek CP fittings of Jaquar or equivalent make
Dual source of water supply
TV / TELEPHONE / DATA POINTS
Compatible wiring which can be hooked up toa cable television network with connections inthe living room and all bedrooms.
Telephone and Data points in the living roomand bedrooms.
LIGHTNING PROTECTION
Lightning protection - in compliance with IS Code.
WATER PROOFING
Water proofing to floors of kitchen, bathrooms, WC, balcony, planter boxes, terraces, landscapeddeck, ultimate roof, pool and open terraces.
DRIVEWAY
Vacuum dewatered reinforced concrete slabat places as per landscape plan.
Paver block and/or bituminous compound.
Duly finished greenery at designated placesaround driveway
AIR CONDITIONING
Living Room & Bedroom
Providing VRV Air Conditioning in all apartments.
FIRE DETECTION & FIGHTING SYSTEM
Provision of adequate fire fighting system with wet riserand fire sprinklers connected to fire reservoir.
183 numbers of fire doors in the project.
Evacuation points and refuge platform for human safetyas per regulation.
Smoke detectors and fire sprinklers as per fire norms.
ELECTRICAL WIRING & FITTING
Total concealed electrical wiring for all rooms provided with electrolytic copper conduits.
Geyser point in all toilets and kitchen.
Stipulated light and plug (5/15amp) point in living,dining and bedrooms as per architectural drawings.
Compatible wiring which can be hooked up to a cable television network with connection thereof in living room and all bedrooms.
Connection of intercom/EPABX with the reception/ security and with all other apartments of the complex.
Modular Switches of reputed brand lightning arrestor.
POWER & BACKUP
24x7 power through mains/standby power.
Through generator power will be provided in the flats during power failure for lighting and other domestic purposes to the extent of 1 (one) watt per sq. ft. built-up area of the said flat, controlled by electric circuit breaker.
Instant changeover between mains and autosynchronized DG set.
LIFTS
Lift make will be of Mitsubishi or equivalent. Each wing has 2 types of lifts as follows:
5 Passenger Lifts: 2300X1800MM which is 14 passengers capacity(gearless elevator system).
3 Service Lifts: 2720X2150MM which is 23 passengers capacity(gearless elevator system).
SECURITY
CCTV monitoring for all common areas and intercom.
Video door phone and Intercom facilities at the entrance of the flat controlled from lobby.
Manned security at main entrance gate & ground floor lobby